case studies

The following case studies demonstrate the high return on investment by implementing Asset Optimization projects across a variety of equipment types. Typical ROI is realized within days or weeks of Implementation.

These case studies demonstrate the high return on investment by implementing Production OEE and Manufacturing Execution Systems across a variety of projects.

Concentrate Dewatering Plant Optimization

Anthony

optimum The process plant in this project struggled to deliver its planned output due to operating constraints in the dewatering plant. The dewatering plant was consistently below the required target and was considered to be the natural bottleneck for the operation. The Management team were considering options to help increase overall production output, however, with limited data available to accurately …

Copper Electrowinning Asset Optimization

Anthony

The customer is a mid-tier copper mining company with copper assets globally. The company produces 300,000 tons of copper p.a. However, it was looking to further its production growth at one of its underperforming sites in the Democratic Republic of Congo (DRC).  optimum The DRC based Copper operation struggled to deliver its planned production output. This was due to an …

Data Integration & Automated Reporting

Anthony

The customer is a mid tier Gold Mining operation with over 14 sites situated globally, with the overall operations producing approximately 1.4 million oz. of gold p.a. The targeted site was a large mining pit located in the heart of Papua New Guinea (PNG) with the potential to produce over 4 million oz. of gold over its foreseeable life span. …

Gold Process Plant Improvement

Anthony

The customer is a mid-tier Indonesian based mining company engaged in exploration, mining and mineral processing of gold and silver bullion. The site had an operating capacity excess of 4 mtpa of ore to produce in excess of 300,000 oz. of gold per annum but was looking to embrace a digital application to help improve production. optimum The mine management …

Metallurgical Accounting & Data Reconciliation

Anthony

The customer is a mid-tier mining company based in Australia who own and operate mines globally. The comapny was looking to improve its existing excel based metallurgical accounting process in line with AMIRA Code P754 at one of the key underground operating assets. They were looking to leverage the digital solution to help drive efficiency and productivity gains by reducing …

Mine Production Hoist Optimization

Anthony

A top tier global mining company, largely considered to be the biggest gold mining company in the world, had a major drive to increase its annual production performance from one of its key operating assets in Tanzania. The Tanzania based asset had struggled to achieve targets with the process plant constrained by supply of ore from the underground hoist.  optimum …

POX Asset health Improvement

Anthony

The customer is a tier one mining company based in Australia and is one of the world’s largest gold producers with operating assets across the globe. The targeted site is one of the world’s largest gold deposits located in Papua New Guinea (PNG). The site was looking to improve the management and monitoring of its Pressure Oxidization (POX) processing area, …

Process Plant Asset Optimization

Anthony

The customer is a tier one company based in Australia and is one of the largest gold producers listed on the Australian stock exchange to date. They are also one of the world’s largest gold mining companies with several operations based globally. MPPIglobal was engaged to help restructure their downtime reporting system as well as implement a Production OEE model …

Clients We Work With